Project Experience

List of Projects by Schmitec Sdn. Bhd.

Year:

2014

CLIENT OWNER STRUCTURE AND SERVICE YEAR
RNZ Integrated PCSB Corrosion Design Basis Memorandum for Gas Blending Facility 2014
Mustang Engineering PCSB Preliminary Material Selection Study for Irong Project 2014
Mustang Engineering PCSB Concept Select HSE Case for Irong Project 2014
Mustang Engineering PCSB Hazard Identification (HAZID) Study (Conceptual) for Irong Project 2014
Mustang Engineering PCSB HSE & Fire Safety Design Philosophy for Irong Project 2014
MMC Oil & Gas PCSB Thermal Radiation, Gas Dispersion and Plume Study for Temana Revisit Project 2014
RNZ Integrated PCSB Baseline Inspection for West Diyarbekir Project, Turkmenistan – (CONSTRUCTION) 2014
MMC Oil & Gas PCSB HAZOP & HAZID for Temana Revisit and Redevelopment Project 2014

Click to go back to top

2013

CLIENT OWNER STRUCTURE AND SERVICE YEAR
AKER Solution Lundin Study of corrosion effect / mitigation for FPSO and Wellhead Platform for Bertam Dev 2013
RNZ Integrated PC(T)SB Corrosion Study for GARAGOL DENIZ WEST DEVELOPMENT PROJECT 2013
MMC Oil & Gas PCSB HAZOP & HAZID for TGAST Project 2013
RNZ Integrated PC(T)SB Mini Hazard Operability Study (HAZOP) for Modification of Gas Outlet of Production. Separator for Magtymguly Central Collector Riser Platform A (MCR-A) 2013
RNZ Integrated PCSB HAZOP & HAZID for Bokor Phase 3 Infill Project 2013
RNZ Integrated PCSB Hazop Study for Workover Campaign BODP-C 2013
RNZ Integrated PCSB Corrosion Design Basis Memorandum for Greater D18 Project (Pre-FEED) 2013
RNZ Integrated PCSB HAZOP & HAZID for Greater D18 Project (Pre-FEED) 2013
MMC Oil & Gas PCSB HAZOP & HAZID for Temana Revisit Project 2013
RNZ Integrated PC(T)SB Corrosion Management Plan for West Diyarbekir Project, Turkmenistan – (CONSTRUCTION) 2013

Click to go back to top

2012

CLIENT OWNER STRUCTURE AND SERVICE YEAR
MMC Oil & Gas PCSB HAZID Study for Angsi facilities Upgrading Project (AFUP) Booster Compression Module 2012
RNZ Integrated PC(T)SB Corrosion Management Plan for Central Diyarbekir Project, Turkmenistan – (DETAIL DESIGN 2012
MMC Oil & Gas PCSB HAZID Study for Angsi Booster Project 2012
RNZ Integrated PCSB HAZOP Study for Besar Development Project 2012
MMC Oil & Gas PCSB Asset Integrity Assessment On Existing Topsides And Pipelines Affected By Angsi CEOR – FEED 2012
MMC Oil & Gas PCSB Corrosion Design Basis Memorandum (CDBM) for Angsi CEOR Host Tie-In – (FEED) 2012
MMC Oil & Gas PCSB Corrosion Design Basis Memorandum (CDBM) for Angsi CEOR Floater – (FEED) 2012

Click to go back to top

2011

CLIENT OWNER STRUCTURE AND SERVICE YEAR
MMC Oil & Gas PCSB Corrosion Study Report On Existing Pipeline And Topside (Addendum) for Angsi – CONCEPTUAL 2011
MMC Oil & Gas PCSB Corrosion Design Basis Memorandum (CDBM) for Angsi CEOR Flexible Pipeline – CONCEPTUAL 2011
MMC Oil & Gas PCSB Corrosion Design Basis Memorandum (CDBM) for Angsi CEOR Floater – (CONCEPTUAL) 2011
OPE (M) Sdn Bhd PCSB Corrosion Management Plan (CMP) for PCSB SKO Pipeline Rejuvenation Project 2011
OPE (M) Sdn Bhd PCSB Corrosion Design Basis Memorandum (CDBM) for PCSB SKO Pipeline Rejuvenation Project 2011
MMC Oil & Gas PCSB Corrosion Design Basis Memorandum (CDBM) for D21 Post-FEED 2011

Click to go back to top

2010

CLIENT OWNER STRUCTURE AND SERVICE YEAR
RNZ Integrated PCSB Corrosion Design Basis Memorandum (CDBM) for Kinabalu Phase II Project 2010
CPOC CPOC Corrosion-Erosion Inspection for Sand-prone piping and cooling water piping 2010